Work Packages
Targeted space missions and technical specifications
Identify the space missions and the customers’ needs for a space IMU. Then, define the technical specifications of the IMU and of the sensors to answer these needs in the frame of EURISA.
D1.1 | IMU specification requirements | Airbus | Confidential |
D1.13 | Sub-functions requirements | ETHZ | Confidential |
D1.15 | Manufacturing flow diagram | Exail | Confidential |
D1.16 | IMU and subfunctions test plans | Exail | Confidential |
Space qualified accelerometers
Develop and validate an accelerometer compatible with space environment and well-suited to reach the IMU performances. We are using the quartz VBA (Vibrating Beam Accelerometer) technology to obtain high performances in a compact package together with space qualified COTS electronic.
D2.2 | Accelerometer compact packaging validation | Exail | Confidential |
D2.4 | Accelerometers triad and electronic boards available for further integration | ETHZ | Confidential |
Space qualified fiber optic gyroscopes
Qualify a fiber optic gyroscope for the IMU based on the gyroscope develop in the frame of the H2020 European project Pioneers. It is a very compact design and it will use space qualified COTS electronic as the accelerometer.
D3.4 | FOG and boards available for integration | Exail | Confidential |
IMU integration and performances qualification
Merge the accelerometers and gyroscopes triads that were developed in WP 2 and 3 to build EURISA IMU. Then, the IMU is tested in representative environments.
Develop algorithms to merge the data and to couple/hybridize all the data for improved navigation.
D4.2 | Report on IMU performance testing and modelling in quiet environment | Exail | Confidential |
Project management
Ensure an effective coordination between the partners and with the European project officer; monitor and organise financial and administration tasks and promote gender equality.
D5.1 | Initial Data, Quality, Risk Management Plan | Exail | Confidential |
Dissemination, communication and exploitation
Define and implement effective strategies for communication, dissemination and exploitation of the results of the project
D6.1 | Project identity set | Exail | Public |
D6.2 | Plan for the Exploitation and Dissemination of Results | Exail | Confidential |
D6.3 | Exploitation and business plan | Airbus | Public |